|
Ross Deeptech Symons have manufactured a number of bespoke engineered
projects covering one off engineering designs, incorporating
hydraulic control systems, with special positioning and fastening
systems, special surface treatments.
Some on a very short lead time including:
- Coil Tubing Injector Frame
- Specialised Wellhead Transportation and Tilting Frame
- Extension of Well Workover Towers
Fast Track Engineering, Design and Fabrication, in 6 weeks,
of a Coil Tubing Injector Support Frame for Installation on
a Well Intervention Vessel.
Design Criteria Include Marine Accelerations and Loadings for differing sea states and for Horizontal Transportation and Vertical Deployment when installed on board.
|